Diary of a Distiller: Chapter 23 - Boiling & Foaming
By JMF on Oct 24, 2008 | In Main | Send feedback »

Over the weekend Mike and I finished most of the pipe work for the brewery and distillery chilling system. All we now need is the pump and that project is done. I mentioned before, but we are using a 500 gallon wine chilling and clearing tank as the reservoir and cooling system for our chilling system. We had it already available, Mike had picked it up awhile ago very inexpensively, and it was just sitting there taking up room and unused. So being thrifty, we decided to make it useful once again. We ran PVC piping many months ago along the walls of the brewery / distillery; going to all the fermenters, the copper spirits still, and locations of future stills. Then we connected the brewery chilling plate and transfer system for the hot wort to the network. Finally we ran the pipe along the ceiling of the basement to the cooling tank, and prepped everything for installing the pump.
Welcome to Diary of a Distiller. I am in the process of moving the content over from the old site. The biggest problem with moving the old content over is the photos. So the text will be here, but photos will have to slowly follow. Until then you can read the old content in the Archives.
You can also read my thoughts on my Journey on Enjoying Libations at: